POA&M reference

    CMMC POA&M Template — and What You Can (and Can't) POA&M

    A Plan of Action & Milestones (POA&M) is the document that lists the CMMC controls you haven't fully met yet, along with your plan to close each gap. Under CMMC Level 2 the POA&M is what lets you earn Conditional status while you finish the last few controls — but only for eligible controls, and only if your SPRS score is at least 88.

    What a CMMC POA&M is

    A POA&M is a per-control action plan. For each unmet requirement it records what the gap is, who owns fixing it, what the remediation approach is, what evidence will prove closure, and when it will be done. Under CMMC Level 2 you have 180 days from the assessment to close every POA&M item and reach a Final CMMC L2 status.

    Skip the manual POA&M drafting.

    Run the free Quick Score to identify your gaps in ~60 seconds. Athena drafts your POA&M line-items straight from the real assessment findings.

    Start the free Quick Score

    The DoD-format POA&M fields

    CMMC POA&Ms follow the same field structure the DoD has used across DFARS 7012 self-assessments and DIBCAC reviews. Every line item should carry, at minimum:

    FieldPurpose
    Control IDThe NIST 800-171 requirement (e.g. 3.1.1, 3.5.3).
    Weakness / gapWhich objectives from 800-171A are not currently met, and why.
    Point value1, 3, or 5 per DoD Assessment Methodology weighting.
    Point of contactNamed owner responsible for closing the gap.
    Resources requiredTools, budget, headcount, or third-party services needed.
    Scheduled completion dateTarget close date (must fall inside the 180-day window).
    MilestonesIntermediate checkpoints with dates.
    Milestone changesAudit trail of slippage — assessors read this.
    Evidence at closureThe artifact(s) that will prove the objective is now met.
    StatusOngoing / Risk-Accepted / Completed.

    What you CAN'T POA&M

    Not every unmet control can go on a POA&M at CMMC L2. The rules that matter:

    • Your SPRS score must be at least 88 (out of 110) at the time of assessment. Below 88, POA&Ms don't rescue you — you don't get a Conditional status.
    • The highest-weighted (5-point) controls generally cannot be POA&M'd. Missing one of those and you don't earn a Conditional status regardless of overall score.
    • All 1-point controls are typically POA&M-eligible, and many 3-point controls are — but check the current DoD Assessment Methodology and CMMC rule text for the definitive list on the day you assess.
    • Every open POA&M item must be closed within 180 days to convert Conditional → Final. Missing the 180-day deadline invalidates the CMMC status.

    POA&M eligibility rules have evolved across CMMC drafts. Always confirm against the current 32 CFR Part 170 rule text and DoD Assessment Methodology at assessment time.

    Example POA&M template structure

    A minimum-viable CMMC POA&M line looks like this:

    Control ID       : 3.10.5
    Requirement      : Control and manage physical access devices.
    Weakness         : Physical access devices (badges, keys, keycards) are
                       issued to staff but the organization does not maintain
                       a current inventory and there is no documented
                       procedure for retrieving devices at termination.
    Objectives unmet : 3.10.5[a] (devices identified),
                       3.10.5[c] (devices managed)
    Point value      : 1
    Owner            : R. Nguyen, Facilities & Physical Security Lead
    Resources        : Badge management system export, HR offboarding
                       checklist update, quarterly reconciliation SOP
    Milestones       : 2026-08-01 draft device inventory + issuance log
                       2026-08-15 add badge-return step to offboarding
                       2026-09-01 first quarterly reconciliation complete
    Scheduled close  : 2026-09-15
    Evidence at close: Physical access device inventory (CSV),
                       HR offboarding checklist w/ badge-return step,
                       Q3 reconciliation report signed by facilities lead
    Status           : Ongoing

    Multiply that across every unmet objective and you have your CMMC POA&M. In Athena, this line is generated automatically from the assessment findings and linked to the evidence that will close it.

    Generate your POA&M from real gaps.

    Start with the free Quick Score to surface unmet objectives, then upgrade to the $129 Readiness Snapshot to export a full DoD-format POA&M with evidence links.

    • All 110 controls
    • SPRS score projection
    • No signup required
    Run the free Quick Score

    Frequently asked questions

    What is a POA&M in CMMC?

    A Plan of Action & Milestones is the per-control action plan for CMMC requirements you don't yet fully meet. It lists the gap, the owner, the closure date, and the evidence that will prove closure. Under CMMC L2 you have 180 days from assessment to close every item.

    Can every CMMC control be put on a POA&M?

    No. The highest-weighted (5-point) controls generally cannot be POA&M'd for a Conditional CMMC L2 status, and you must have a SPRS score of at least 88 to be POA&M-eligible at all. Confirm the current eligibility list at assessment time.

    How long do I have to close a CMMC POA&M?

    180 days from the CMMC L2 assessment date. If you miss that window, the Conditional CMMC status expires and you lose eligibility until a new assessment.

    Do I need a POA&M if my SPRS score is already 110?

    No — a score of 110 means every objective is met and there's nothing to plan for. Most organizations do have a POA&M, though, because scoring is all-or-nothing per control.

    Further reading

    Related Athena pages and authoritative external references.

    Ready to act on this?

    Run the free Quick Score, then walk through the Assessment Pack.